CERN Accelerating science

All PS Complex

最近の追加:
2022-01-21
09:53
Specification for the Modification of the Main Power Converters for the Antiproton Accelerator (AD) / Volker, F
CERN-PS-PO-NOTE-97-08-Spec.
- 1997.

レコードの詳細 - ほとんど同じレコード
2022-01-21
09:40
ISOLDE Beam Profile Test with Sem Grids / Wildner, E
CERN-PS-OP-NOTE-94-64-MD.
- 1994.
Full text

レコードの詳細 - ほとんど同じレコード
2022-01-20
09:39
CERN-MEDICIS: A Unique Facility for the Production of Non-Conventional Radionuclides for the Medical Research / Duchemin, Charlotte (CERN) ; Barbero-Soto, Esther (CERN) ; Bernardes, Ana (CERN) ; Catherall, Richard (CERN) ; Chevallay, Eric (CERN) ; Cocolios, Thomas (Leuven U.) ; Dorsival, Alexandre (CERN) ; Fedosseev, Valentin (CERN) ; Fernier, Pascal (CERN) ; Gilardoni, Simone (CERN) et al.
The MEDICIS facility is a unique facility located at CERN dedicated to the production of non-conventional radionuclides for research and development in imaging, diagnostics and radiation therapy. It exploits in a Class A work sector, a dedicated isotope separator beam line, a target irradiation station at the 1.4 GeV Proton Synchroton Booster (PSB) and receives activated targets from external institutes during CERN Long Shut-Downs. [...]
2021 - 5 p. - Published in : JACoW IPAC 2020 (2020) THVIR13 Fulltext: PDF;
In : 11th International Particle Accelerator Conference, Caen, France, 10 - 15 May 2020, pp.THVIR13

レコードの詳細 - ほとんど同じレコード
2022-01-19
14:57
Energy Matching Between the AD and ELENA / Albright, Simon (CERN) ; Gamba, Davide (CERN)
Correct energy matching between two synchrotrons is necessary to optimise performance of the downstream accelerator. [...]
CERN-ACC-NOTE-2022-0004.
- 2022. - 3 p.
Full text

レコードの詳細 - ほとんど同じレコード
2022-01-18
14:33
Recommissioning of the CERN AD Stochastic Cooling System in 2021 after Long Shutdown 2 / Hofle, Wolfgang (CERN) ; Oliveira, Joao Carlos (CERN) ; Carli, Christian (CERN) ; Caspers, Fritz (European Scientific Institute (FR)) ; Dupuy, Bruno (CERN) ; Gamba, Davide (CERN) ; Louwerse, Reinier (CERN) ; Ponce, Laurette (CERN) ; Myklebust, Vebjorn Roed ; Rey, Stephane Franck (CERN) et al.
The power system of the Stochastic Cooling System of the anti-proton decelerator AD at CERN, installed on top of the shielding blocks of the AD ring, was completely dismantled during the long shutdown 2 (LS2) at the end of the 2018 run in order to gain access to the accelerator for magnet consolidation. [...]
CERN-ACC-NOTE-2022-0003 ; ISBN: 978-3-95450-243-1 ; ISSN: 2226-0374 ; doi: 10.18429/JACoW-COOL2021-S302.
- 2022. - 6 p.
Access to fulltext

レコードの詳細 - ほとんど同じレコード
2022-01-05
12:30
Energy Matching Between Linac4 and the PSB / Albright, Simon (CERN) ; Antoniou, Fanouria (CERN) ; Asvesta, Foteini (CERN) ; Skowronski, Piotr Krzysztof (CERN)
Until 2018, before Long Shutdown 2, injection to the PSB was done with a coasting proton beam from Linac2, which was then captured by the RF system. [...]
CERN-ACC-NOTE-2022-0001.
- 2022. - 7 p.
Full text

レコードの詳細 - ほとんど同じレコード
2021-12-15
00:44
Challenging the Standard Model by high precision comparisons of the fundamental properties of antiprotons and protons / Borchert, Matthias Joachim
This thesis describes high precision measurements on the fundamental properties of the antiproton, namely the charge-to-mass ratio and the magnetic moment [...]
CERN-THESIS-2021-230 - Hannover : Gottfried Wilhelm Leibniz Universität, 2021-12-14.


レコードの詳細 - ほとんど同じレコード
2021-12-14
06:22
Chapter 5 Infrastructure consolidation / Burdelski, P (CERN) ; Dragoni, F (CERN) ; Grau, Silvia (CERN) ; Guillaume, J-C (CERN) ; Jaillet, D (CERN) ; Mcilwraith, S (CERN) ; Polenghi, M (CERN) ; Sanchez, E (CERN)
Constructed in 1963, Building 157 is 113 m long and 43 m wide at ground level. The roof is 21.8 m high at the central point above a skylight running longitudinally down its centre; it has a slope of 20% running down to the longitudinal façade summits at 15.6 m [...]
2021 - 27 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.89-115

レコードの詳細 - ほとんど同じレコード
2021-12-14
06:22
Chapter 4: Beamline – main components / Carlsen, B (CERN) ; Carvalho, F (CERN) ; De Jesus, V (CERN) ; De La Gama, J (CERN) ; Ebn Rahmoun, A (CERN) ; Froeschl, Robert (CERN) ; Gourber-Pace, Marine (CERN) ; Grenier-Boley, Edouard (CERN) ; Lopez, R (CERN) ; Mompo, Richard (CERN) et al.
The East Area renovation will cover the refurbishment of the East Hall with its beamlines and infrastructures. A re-design of the beamlines is included to improve the magnet situation, the radiation situation, and maintainability in general. [...]
2021 - 45 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.43-87

レコードの詳細 - ほとんど同じレコード
2021-12-14
06:22
Chapter 3: Design of the East Area facility after renovation / Bernhard, Johannes Benedikt (CERN) ; Dogru, G (CERN) ; Evrard, S (CERN) ; Froeschl, Robert (CERN) ; Harrouch, E (CERN) ; Lazzaroni, M (CERN)
The PS primary proton beam is slowly extracted at 24 GeV/c towards the East Area with the help of the third- order resonance technique over a typical spill length of 350 to 450 ns within 2.4 s cycles. The number of East Area extractions is usually around five to six per overall PS super-cycle of typically 40 s and depends on both users and schedule constraints, respectively. [...]
2021 - 26 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.17-42

レコードの詳細 - ほとんど同じレコード