CERN Accelerating science

PS Complex

Ultimi arrivi:
2019-03-19
06:54
Performance Evaluation of Linac4 During the Reliability Run / Rey Orozko, Odei (CERN) ; Apollonio, Andrea (CERN) ; Erhard, Silvia (CERN) ; Guidoboni, Greta (CERN) ; Mikulec, Bettina (CERN) ; Uythoven, Jan (CERN)
Linac4 will replace Linac2 as the first element in the CERN proton injector chain from 2020 onwards, following the second LHC long shutdown (LS2). With more than three times higher energy and number of compo-nents than Linac2, beam availability is one of the main challenges of Linac4. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-WEPAF077 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.WEPAF077

Record dettagliato - Record simili
2019-03-14
06:01
Instability studies at the CERN Proton Synchrotron during transition crossing / Migliorati, M (CERN ; U. Rome La Sapienza (main) ; INFN, Rome) ; Aumon, S (CERN) ; Koukovini-Platia, E (CERN) ; Huschauer, A (CERN) ; Métral, E (CERN) ; Sterbini, G (CERN) ; Wang, N (Beijing, Inst. High Energy Phys.)
The CERN Proton Synchrotron (PS) routinely crosses transition energy at around 6 GeV in order to accelerate protons that are injected in the Super Proton Synchrotron (SPS) or transferred to users of fixed target experiments. Depending on the beam parameters and intensity, a fast vertical coherent instability occurs during transition crossing. [...]
2018 - 13 p. - Published in : Phys. Rev. Accel. Beams 21 (2018) 120101 Fulltext from Publisher: PDF;

Record dettagliato - Record simili
2019-03-14
06:01
Schedule Evolution of the Linac4 Installation During the Lifetime of the Linac4 Project and Connection Forecast / Coupard, Julie (CERN) ; Berjillos, Aurelio (CERN) ; Corso, Jean-Pierre (CERN) ; Foraz, Katy (CERN) ; Nicquevert, Bertrand (CERN) ; Paulat, Emmanuel (CERN) ; Vretenar, Maurizio (CERN)
The new CERN linear accelerator Linac4 started the installation phase in 2010 after the delivery of the new building and tunnel by the civil engineering and was inaugurated six years later. It will be connected to the CERN accelerators chain and replace the current proton linear accelerator, Linac2, during the second long shut-down (LS2) of the Large Hadron Collider (LHC) in 2019. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAF044 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF044

Record dettagliato - Record simili
2019-03-14
06:01
Distributed Optical Fiber Radiation Sensing at CERN / Li Vecchi, Gaetano (CERN) ; Brugger, Markus (CERN) ; Danzeca, Salvatore (CERN) ; Di Francesca, Diego (CERN) ; Ferraro, Rudy (CERN) ; Girard, Sylvain (Lab. Hubert Curien, St. Etienne) ; Kadi, Yacine (CERN) ; Stein, Oliver (CERN)
CERN’s accelerator tunnels are very complex mixed field radiation environments, in which many electronic components and systems are installed. The radiation gen- erated by the circulating beam degrades all electronic equipment and impacts directly its lifetime. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-WEPAF083 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.WEPAF083

Record dettagliato - Record simili
2019-03-12
08:43
Accelerators Validating Antimatter Physics / Welsch, Carsten (U. Liverpool (main) ; Cockcroft Inst. Accel. Sci. Tech.)
The Extra Low Energy Antiproton ring (ELENA) will be a critical upgrade to the unique Antiproton Decelerator facility at CERN and is currently being commissioned. ELENA will significantly enhance the achievable beam quality and enable new experiments. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAL067 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAL067

Record dettagliato - Record simili
2019-03-09
13:00
Optics optimization of tertiary particle beamlines and efficiency measurement of prototype scintillating fiber detectors / Chatzidaki, Panagiota
Two new beamlines, constituting extensions of the already existing H2 and H4 secondary beamlines of the North Area Complex of SPS at CERN, have been designed and installed in the framework of the CERN Neutrino Platform Project [...]
CERN-THESIS-2018-373 - 145 p.

Fulltext
Record dettagliato - Record simili
2019-03-05
06:41
Status of the Commissioning of the LIGHT Prototype / Degiovanni, Alberto (Unlisted, CH) ; Adam, Joel (Unlisted, CH) ; Aguilera Murciano, Debora (Unlisted, CH) ; Ballestrero, Sergio (Unlisted, CH) ; Benot-Morell, Alfonso (Unlisted, CH) ; Bonomi, Rossana (Unlisted, CH) ; Cabaleiro Magallanes, Francisco (Unlisted, CH) ; Caldara, Michele (Unlisted, CH) ; Cerv, Matevz (Unlisted, CH) ; D'Auria, Gerardo (Unlisted, CH ; Sincrotrone Trieste) et al.
The company A.D.A.M. (Application of Detectors and Accelerators to Medicine), a CERN spin-off, is working on the construction and testing of its first linear accelerator for medical application: LIGHT (Linac for Image-Guided Hadron Therapy). [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPML014 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPML014

Record dettagliato - Record simili
2019-02-28
06:39
The Beamlines of the CERN East Area Renovation Project / Bernhard, Johannes (CERN) ; Bonnet, Michel (CERN) ; Bouirek, Quentin (CERN) ; Brethoux, Damien (CERN) ; Carlsen, Bard (CERN) ; Ebn Rahmoun, Aboubakr (CERN) ; Etheridge, John (CERN) ; Evrard, Sebastien (CERN) ; Gatignon, Laurent (CERN) ; Harrouch, Erwan (CERN) et al.
The East Area at the Proton Synchrotron is one of CERN’s longest running facilities for experiments, beam tests, and irradiations with a successful history of over 55 years. The facility serves more than 20 user teams for about 200 days of running each year and offers mixed secondary hadron, electron and muon beams of 0.5 GeV/c to 10 GeV/c. [...]
2018 - 3 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAF023 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF023

Record dettagliato - Record simili
2019-02-26
08:30
Design and Construction of the CERN PS Booster Charge Exchange Injection Chicane Bumpers / Balhan, Bruno (CERN) ; Baud, Cedric (CERN) ; Borburgh, Jan (CERN) ; Hourican, Michael (CERN)
In the framework of the LIU project and the connection from LINAC4 to PS Booster, the 160 MeV H⁻ beam will be injected horizontally into the PSB by means of one charge-exchange injection system for each PSB ring. A set of four outside vacuum pulsed dipole magnets (BSW) creating the required injection bump has been designed and built. [...]
2018 - 3 p. - Published in : 10.18429/JACoW-IPAC2018-WEPMF082 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.WEPMF082

Record dettagliato - Record simili
2019-02-26
08:29
First Results From the Operation of a Rest Gas Ionisation Profile Monitor Based on a Hybrid Pixel Detector / Storey, James (CERN) ; Bertsche, William (Manchester U.) ; Bodart, Dominique (CERN) ; Dehning, Bernd (CERN) ; Gibson, Stephen (Royal Holloway, U. of London) ; Levasseur, Swann (Royal Holloway, U. of London) ; Sandberg, Hampus (Manchester U.) ; Sapinski, Mariusz (Darmstadt, GSI) ; Satou, Kenichirou (KEK, Tsukuba) ; Schneider, Gerhard (CERN) et al.
A novel rest gas ionisation profile monitor which aims to provide a continuous non-destructive bunch-by-bunch measurement of the transverse emittance is currently under development for the CERN Proton Synchrotron (CPS). Uniquely for this type of instrument the imaging detector that measures the position of the ionisation electrons consists of an array of pixelated silicon sensors which are read-out using Timepix3 readout chips. [...]
2018 - 5 p. - Published in : 10.18429/JACoW-IBIC2017-WE2AB5 Fulltext: PDF;
In : 6th International Beam Instrumentation Conference, Grand Rapids, MI, USA, 20 -24 Aug 2017, pp.WE2AB5

Record dettagliato - Record simili