Final descent for CMS

22-01-2008.

The 15th and last section of the CMS detector was lowered on Tuesday 22 January. The YE-1 endcap (1430 tonnes) began its 100-metre descent at 7 am and arrived gently on the floor of the experiment hall at 5.30 pm.
The 15th and last section of the CMS detector was lowered on Tuesday 22 January. The YE-1 endcap (1430 tonnes) began its 100-metre descent at 7 am and arrived gently on the floor of the experiment hall at 5.30 pm.

 

© CERN 2024 - CERN Publications, IR-ECO-CO