2022-11-09 18:45 |
详细记录 - 相似记录
|
2022-11-09 18:45 |
详细记录 - 相似记录
|
2022-10-19 15:51 |
详细记录 - 相似记录
|
2022-10-19 15:50 |
详细记录 - 相似记录
|
2022-09-20 17:26 |
Proton drivers for neutrino factories: The CERN approach
/ Schönauer, H ; Autin, B ; Cappi, R ; Chanel, M ; Franchetti, G ; Gareyte, J ; Garoby, R ; Giovannozzi, M ; Haseroth, H ; Martini, M et al.
CERN-PS-2000-065-AE; CERN-PS-2000-065-AE; CERN-NUFACT-Note-046.-
Geneva : CERN, 2000 - 10 p.
Fulltext: PDF;
|
详细记录 - 相似记录
|
2022-09-20 17:26 |
Phase Rotation, Cooling And Acceleration Of Muon Beams: A Comparison Of Different Approaches
/ Franchetti, G. (CERN) ; Gilardoni, Simone S. (CERN) ; Gruber, P. (CERN) ; Hanke, K. (CERN) ; Haseroth, H. (CERN) ; Holzer, E.B. (CERN) ; Kuchler, D. (CERN) ; Lombardi, A.M. (CERN) ; Scrivens, R. (CERN)
Experimental and theoretical activities are underway at CERN [1] with the aim of examining the feasibility of a very-high-flux neutrino source (»1021 neutrinos/year). In the present scheme, a high-power proton beam (some 4 MW) bombards a target where pions are produced. [...]
physics/0008065; LINAC2000-THC17; CERN-NUFACT-Note-41; CERN-NUFACT-Note-041; CERN-PS-2000-054; CERN-NEUTRINO-FACTORY-Note-41; CERN-PS-2000-054-PP.-
Geneva : CERN, 2000 - 3 p.
- Published in : eConf C: 000821 (2000) , pp. THC17 - Published in : , pp. 893-895
Fulltext: arXiv:physics_0008065 - PDF; CERN-PS-2000-054 - PDF;
In : 20th International Linear Accelerator Conference, Monterey, CA, USA, 21 - 25 Aug 2000, pp.THC17
|
详细记录 - 相似记录
|
2022-09-20 17:19 |
A high-intensity H- LINAC at CERN based on LEP-2 cavities
/ Vretenar, M. (CERN)
/SPL Study Group Collaboration
In view of a possible evolution of the CERN accelerator complex towards higher proton intensities, a 2.2 GeV H- linac with 4 MW beam power has been designed, for use in connection with an accumulator and compressor ring as proton driver of a muon-based Neutrino Factory. The high-energy part of this linac can use most of the RF equipment (superconducting cavities and klystrons) from the LEP collider after its decommissioning at the end of 2000. [...]
physics/0008142; LINAC2000-TU206; CERN-NEUTRINO-FACTORY-Note-40; CERN-NUFACT-Note-40; CERN-PS-2000-059-RF.-
Geneva : CERN, 2000 - 5 p.
- Published in : eConf C: 000821 (2000) , pp. TU206
Fulltext: arXiv:physics_0008142 - PDF; CERN-PS-2000-059-RF - PDF;
In : 20th International Linear Accelerator Conference, Monterey, CA, USA, 21 - 25 Aug 2000, pp.TU206
|
详细记录 - 相似记录
|
2022-09-20 17:00 |
详细记录 - 相似记录
|
2009-12-10 20:10 |
详细记录 - 相似记录
|
2009-11-19 14:50 |
Beam stability in the SPL-Proton Driver accumulator for a Neutrino Factory at CERN
/ Benedetto, E (CERN)
Longitudinal and transverse instabilities in the isochronous accumulator for the CERN proton driver are studied, in order to find cures and set limits to the machine impedance..
CERN-BE-2009-037; CERN-NEUTRINO-FACTORY-NOTE-156; CERN-NUFACT-Note-156.-
Geneva : CERN, 2010 - 5 p.
- Published in : AIP Conf. Proc. 1222 (2010) 283-287
Fulltext: PDF;
In : 11th international workshop on neutrino factories, superbeams, and beta beams, Chicago, IL, USA, 20 - 25 Jul 2009, pp.283-287
|
详细记录 - 相似记录
|
|
|