CERN Accelerating science

Design Reports

Senast inlagda poster:
2013-06-18
11:42
CMS TECHNICAL DESIGN REPORT FOR THE LEVEL-1 TRIGGER UPGRADE / Tapper, A (Imperial College London)
This report describes the technical design and outlines the expected performance of the Phase 1 Upgrade of the CMS Level-1 Trigger. [...]
CERN-LHCC-2013-011 ; CMS-TDR-012.
- 2013.
Fulltext

Detaljerad journal - Similar records
2013-06-03
17:27
Fast TracKer (FTK) Technical Design Report / Shochet, M ; Tompkins, L ; Cavaliere, V ; Giannetti, P ; Annovi, A ; Volpi, G
The FTK is a system that does global track reconstruction after each level-1 trigger to enable the level-2 trigger to have early access to tracking information..
CERN-LHCC-2013-007 ; ATLAS-TDR-021.
- 2013.
Fulltext

Detaljerad journal - Similar records
2013-06-03
14:21
New Small Wheel Technical Design Report / Kawamoto, T ; Vlachos, S ; Pontecorvo, L ; Dubbert, J ; Mikenberg, G ; Iengo, P ; Dallapiccola, C ; Amelung, C ; Levinson, L ; Richter, R et al.
In order to benefit from the expected high luminosity performance that will be provided by the Phase-I upgraded LHC, the first station of the ATLAS muon end-cap system (Small Wheel,SW) will need to be replaced. [...]
CERN-LHCC-2013-006 ; ATLAS-TDR-020.
- 2013.
Fulltext

Detaljerad journal - Similar records
2012-10-22
19:58
Configuration Manual : Polarized Proton Collider at RHIC / Alekseev, I
Upton, NY : Brookhaven Nat. Lab., 2006. - 166 p.
Fulltext

Detaljerad journal - Similar records
2012-10-22
19:58
Relativistic Heavy Ion Collider : Configuration Manual
Upton, NY : Brookhaven Nat. Lab., 2006. - 345 p.
Fulltext

Detaljerad journal - Similar records
2012-10-22
19:58
Booster Design Manual / Alessi, J (ed.)
Upton, NY : Brookhaven Nat. Lab., 2005. - 127 p.
Fulltext

Detaljerad journal - Similar records
2012-10-22
19:58
Booster Design Manual
Upton, NY : Brookhaven Nat. Lab., 1986. - 267 p.
Fulltext

Detaljerad journal - Similar records
2012-10-22
19:58
Alternating Gradient Synchrotron Project : Construction Completion Report
Upton, NY : Brookhaven Nat. Lab., 1966. - 263 p.
Fulltext

Detaljerad journal - Similar records
2012-09-27
15:21
CMS Technical Design Report for the Pixel Detector Upgrade / Dominguez, A (University of Nebraska -- Lincoln)
The original design goal of the LHC was to operate at 1E34 cm^{−2}s^{−1} with 25 ns bunch spacing, where approximately 25 simultaneous inelastic collisions per crossing (“pile-up”) occur. [...]
CERN-LHCC-2012-016 ; CMS-TDR-11.
- 2012.
Fulltext

Detaljerad journal - Similar records
2012-09-27
15:21
CMS Technical Design Report for the Phase 1 Upgrade of the Hadron Calorimeter / Mans, J (University of Minnesota)
This report describes the technical design and outlines the expected performance of the Phase 1 Upgrade of the CMS Hadron Calorimeters. [...]
CERN-LHCC-2012-015 ; CMS-TDR-10.
- 2012.
Fulltext

Detaljerad journal - Similar records