CERN Accelerating science

PS Complex

Latest additions:
2014-11-27
16:12
The Status of Beam Diagnostics for the HIE-ISOLDE Linac at CERN / Andreazza, W ; Bravin, E ; Cantero, ED ; Sosa, A
The HIE-ISOLDE project aims at upgrading the CERN ISOLDE radioactive ion beam facility for higher beam intensities and higher beam energies. [...]
CERN-BE-2014-004.
- 2014. - 4 p.
Full text

Detailed record - Similar records
2014-11-27
15:59
Upgrade of the Fast Beam Intensity Measurement System for the CERN PS Complex / Allica, JC ; Andersen, M ; Andreazza, W ; Belohrad, D ; Favre, G ; Favre, N ; Jensen, L ; Lenardon, F ; Vollenberg, W
The CERN Proton Synchrotron complex (CPS) has been operational for over 50 years. [...]
CERN-BE-2014-003.
- 2014. - 5 p.
Full text

Detailed record - Similar records
2014-11-27
14:31
Energy and time of flight measurements of REX-ISOLDE stable beams using Si detectors / Cantero, E D ; Bravin, E ; Fraser, M A ; Lanaia, D ; Sosa, A ; Voulot, D ; Zocca, F
In this paper we present energy and time spectroscopy measurements for the stable beams of REX-ISOLDE obtained using Si detectors. [...]
CERN-ACC-NOTE-2014-0102.
- 2014. - 21 p.
Full text

Detailed record - Similar records
2014-11-27
14:28
HIE-ISOLDE Faraday cups tested with ion beams at TRIUMF / Cantero, E D ; Sosa, A
The future HIE-ISOLDE Faraday cups for both the intercryomodule regions and the HEBTs have been tested using 34S+7, 4He+, 23Na+6 and 20Ne+5 beams from the ISAC-II accelerator at TRIUMF. [...]
CERN-ACC-NOTE-2014-0101.
- 2014. - 12 p.
Full text

Detailed record - Similar records
2014-11-27
14:25
Transverse beam profile measurements with slit scanner and Faraday cup at REX-ISOLDE / Cantero, E D ; Bravin, E ; Lanaia, D ; Sosa, A ; Voulot, D
The transverse profiles for the HIE-ISOLDE beams will be measured using a system composed of a scanning slit and a Faraday cup. [...]
CERN-ACC-NOTE-2014-0100.
- 2014. - 9 p.
Full text

Detailed record - Similar records
2014-11-27
14:21
Acceptance test for the linear motion actuator for the scanning slit of the HIE-ISOLDE short diagnostic boxes / Cantero, E D ; Andreazza, W ; Bravin, E ; Sosa, A
We performed experimental tests to characterize the mechanical accuracy of a linear actuator designed by the company AVS for the movement of the scanning slit of the HIE-ISOLDE short diagnostic boxes. [...]
CERN-ACC-NOTE-2014-0099.
- 2014. - 21 p.
Full text

Detailed record - Similar records
2014-11-27
14:18
Beam Dynamics Studies of a Multi-harmonic Buncher for 10 MHz Post-accelerated RIBs at HIE-ISOLDE / Fraser, M A
A comprehensive beam dynamics study was carried out to assess the performance of a proposed bunching system at HIE-ISOLDE to increase the bunch spacing of post-accelerated radioactive ion beams by a factor of 10 to approximately 100 ns. [...]
CERN-ACC-NOTE-2014-0098.
- 2014. - 47 p.
Full text

Detailed record - Similar records
2014-11-27
14:15
An Automatic Cavity Phasing Routine for HIE-ISOLDE / Haastrup, S ; Fraser, M A
The broad experimental programme at ISOLDE means that the same beam species and energy are rarely studied twice and the cavities of the linac must be scaled or re-phased for each experiment. [...]
CERN-ACC-NOTE-2014-0097.
- 2014. - 21 p.
Full text

Detailed record - Similar records
2014-11-17
15:34
Multipacting Simulations of Tuner-adjustable waveguide coupler (TaCo) with CST Particle Studio® / Shafqat, N (Pakistan Atomic Energy Commission) ; Gerigk, F (-) ; Wegner, R (-)
Tuner-adjustable waveguide couplers (TaCo) are used to feed microwave power to different RF structures of LINAC4 [...]
CERN-ACC-NOTE-2014-0094.
- 2014. - 17 p.
Full text

Detailed record - Similar records
2014-11-17
11:42
CERN Yellow Report Front Cover Conceptual Design of the Low-Power and High-Power SPL : A Superconducting H$^-$ Linac at CERN / Gerigk, F (ed.)
The potential for a superconducting proton linac (SPL) at CERN started to be seriously considered at the end of the 1990s [...]
CERN-2014-007. - Geneva : CERN, 2014. - 173 p.


10.5170/CERN-2014-007
Fulltext
Detailed record - Similar records