CERN Accelerating science

PS Complex

Latest additions:
2014-09-18
17:04
First Considerations on Beam Optics and Lattice Design for the Future Hadron-Hadron Collider FCC / Alemany Fernandez, R (CERN) ; Holzer, B (CERN)
The present document explains the steps carried out in order to make the first design of the Future Hadron-Hadron Collider (FCC-hh) following the base line parameters that can be found in [1]. [...]
CERN-ACC-NOTE-2014-0065.
- 2014. - 17 p.
Full text

Detailed record - Similar records
2014-09-17
12:26
SPS Beam Steering for LHC Extraction / Gianfelice Wendt, E (Fermilab) ; Bartosik, H (-) ; Cornelis, K (-) ; Norderhaug Drosdal, L (-) ; Goddard, B (-) ; Kain, V (-) ; Meddahi, M (-) ; Papaphilippou, Y (-) ; Wenninger, J (-)
Beside producing beams for fixed target operation, the CERN Super Proton Synchrotron (SPS) accelerates beams for injection into the Large Hadron Collider (LHC). [...]
CERN-ACC-2014-0204.
- 2014. - 3 p.

Detailed record - Similar records
2014-09-17
12:20
Field Simulations and Mechanical Implementation of Electrostatic Elements for the ELENA Transfer Lines / Barna, D (University of Tokio, Japan) ; Bartmann, W (-) ; Borburgh, J (-) ; Carli, C (-) ; Vanbavinckhove, G (-)
The Antiproton Decelerator (AD) complex at CERN will be extended by an extra low energy anti-proton ring (ELENA) [1] further decelerating the anti-protons thus improving their trapping. [...]
CERN-ACC-2014-0203.
- 2014. - 3 p.
Full text

Detailed record - Similar records
2014-09-12
16:45
Upgrades of the CERN PS Booster Ejection Lines / Bartmann, W ; Abelleira, JL ; Hanke, K ; Kowalska, M
The PS Booster extraction energy will be augmented from 1.4 to 2 GeV to reduce intensity limits due to space charge at the PS proton injection. [...]
CERN-ACC-2014-0202.
- 2014. - 3 p.
Full text

Detailed record - Similar records
2014-09-10
09:48
Feed Forward Orbit Correction in the CLIC Ring to Main LINAC Transfer lines / Apsimon, R ; Latina, A ; Schulte, D ; Uythoven, J
The emittance growth in the betatron collimation system of the 27 km long transfer lines between the CLIC damping rings and the main LINAC depends strongly on the transverse orbit jitter. [...]
CERN-ACC-2014-0201.
- 2014. - 4 p.

Detailed record - Similar records
2014-09-10
09:43
Injection and Extraction Systems for a High-Power Proton Synchrotron at CERN / Bartmann, W ; Fedosseev, V ; Goddard, B ; Kramer, T
A new High-Power Proton Synchrotron (HP-PS) is being studied at CERN for the second phase of the Long Baseline Neutrino facility (LAGUNA-LBNO) where a 2 MW beam power shall impinge onto a target. [...]
CERN-ACC-2014-0200.
- 2014. - 3 p.

Detailed record - Similar records
2014-09-05
16:44
Prediction of the Field Distribution in CERN-PS Magnets / Schoerling, D (CERN)
The CERN Proton Synchrotron (PS) has a circumference of 628m and operates at an energy of up to 26 GeV. [...]
CERN-ACC-2014-0196.
- 2014. - 3 p.
Full text

Detailed record - Similar records
2014-09-05
16:40
Status of the ELENA Magnet System / Schoerling, D
ELENA, the Extra Low ENergy Antiproton ring, will be a CERN facility with the purpose to deliver antiprotons at lowest energies aiming to enhance the study of antimat-ter. [...]
CERN-ACC-2014-0195.
- 2014. - 3 p.

Detailed record - Similar records
2014-09-05
16:33
Design of the Beam Transfer Line Magnets for HIE-ISOLDe / Bauche, J (CERN) ; Aloev, A (CERN)
This paper describes the design of the beam transfer line magnets of the HIE-ISOLDE facility. [...]
CERN-ACC-2014-0194.
- 2014. - 3 p.
Full text

Detailed record - Similar records
2014-08-21
17:18
Investigation of Coupling during the Non-Local Fast Extraction in the SPS / Alekou, A ; Bartosik, H ; Papaphilippou, Y
The CENF (CERN Neutrino Facility) requires a high-intensity and high-energy beam (100 GeV) to be extracted in only one machine revolution from the Long Straight Section 2 (LSS2) of the SPS. [...]
CERN-ACC-NOTE-2014-0060.
- 2014. - 11 p.
Full text

Detailed record - Similar records