CERN Accelerating science

PS Complex

Latest additions:
2014-09-30
08:54
Summary of the Space Charge Collaboration Meeting May 2014 / Schmidt, F (CERN)
The space charge collaboration meeting took place at CERN on 20 and 21 May 2014. It was co-sponsored by EuCARD-2 WP5.3 XBEAM XRING. [...]
CERN-ACC-2014-0208.- Geneva : CERN, 2014 Fulltext: PDF;
In : SC collaboration meeting May 2014., Geneva, Switzerland, 20 - 21 May 2014

Detailed record - Similar records
2014-09-26
12:34
Analysis of trapping fractions for a 4D Hénon map / Van Bergen, Giel Henricus (CERN)
For beam injection from the PS into the SPS, one performs an extraction in multiple turns, a so called multi-turn extraction. [...]
CERN-STUDENTS-Note-2014-222.
- 2014.
Access to fulltext

Detailed record - Similar records
2014-09-26
10:36
Boron ion beam production with the supernanogan ECR ion source for the CERN BIO-LEIR facility / Stafford-Haworth, J (CERN) ; John Adams Institute at Royal Holloway, University of London (-) ; Küchler, D (CERN) ; Scrivens, R (CERN) ; Toivanen, V (CERN) ; Röhrich, J (Helmholtz-Zentrum Berlin für Materialien und Energie GmbH)
To deliver B3+ ions for medical research the compounds decaborane and m-carborane were tested using the metal ions from volatile compounds (MIVOC) method with the Supernanogan 14.5 GHz ECR ion source. [...]
CERN-ACC-2014-0206.
- 2014. - 5 p.
Full text

Detailed record - Similar records
2014-09-26
09:24
Estimation of potential radiation damage to electronics units in the CLIC tunnel / Patapenka, Andrei (Joint Inst. Power Nucl. Res., Minsk) ; Mallows, Sophie (CERN)
An electronic unit is required for each CLIC “Two Beam Module”. [...]
CERN-OPEN-2014-047 ; clic_note_1028.
- 2014. - 10 p.
Preprint

Detailed record - Similar records
2014-09-18
17:04
First Considerations on Beam Optics and Lattice Design for the Future Hadron-Hadron Collider FCC / Alemany Fernandez, R (CERN) ; Holzer, B (CERN)
The present document explains the steps carried out in order to make the first design of the Future Hadron-Hadron Collider (FCC-hh) following the base line parameters that can be found in [1]. [...]
CERN-ACC-NOTE-2014-0065.
- 2014. - 17 p.
Full text

Detailed record - Similar records
2014-09-17
12:26
SPS Beam Steering for LHC Extraction / Gianfelice Wendt, E (Fermilab) ; Bartosik, H (-) ; Cornelis, K (-) ; Norderhaug Drosdal, L (-) ; Goddard, B (-) ; Kain, V (-) ; Meddahi, M (-) ; Papaphilippou, Y (-) ; Wenninger, J (-)
Beside producing beams for fixed target operation, the CERN Super Proton Synchrotron (SPS) accelerates beams for injection into the Large Hadron Collider (LHC). [...]
CERN-ACC-2014-0204.
- 2014. - 3 p.

Detailed record - Similar records
2014-09-17
12:20
Field Simulations and Mechanical Implementation of Electrostatic Elements for the ELENA Transfer Lines / Barna, D (University of Tokio, Japan) ; Bartmann, W (-) ; Borburgh, J (-) ; Carli, C (-) ; Vanbavinckhove, G (-)
The Antiproton Decelerator (AD) complex at CERN will be extended by an extra low energy anti-proton ring (ELENA) [1] further decelerating the anti-protons thus improving their trapping. [...]
CERN-ACC-2014-0203.
- 2014. - 3 p.
Full text

Detailed record - Similar records
2014-09-12
16:45
Upgrades of the CERN PS Booster Ejection Lines / Bartmann, W ; Abelleira, JL ; Hanke, K ; Kowalska, M
The PS Booster extraction energy will be augmented from 1.4 to 2 GeV to reduce intensity limits due to space charge at the PS proton injection. [...]
CERN-ACC-2014-0202.
- 2014. - 3 p.
Full text

Detailed record - Similar records
2014-09-10
09:48
Feed Forward Orbit Correction in the CLIC Ring to Main LINAC Transfer lines / Apsimon, R ; Latina, A ; Schulte, D ; Uythoven, J
The emittance growth in the betatron collimation system of the 27 km long transfer lines between the CLIC damping rings and the main LINAC depends strongly on the transverse orbit jitter. [...]
CERN-ACC-2014-0201.
- 2014. - 4 p.

Detailed record - Similar records
2014-09-10
09:43
Injection and Extraction Systems for a High-Power Proton Synchrotron at CERN / Bartmann, W ; Fedosseev, V ; Goddard, B ; Kramer, T
A new High-Power Proton Synchrotron (HP-PS) is being studied at CERN for the second phase of the Long Baseline Neutrino facility (LAGUNA-LBNO) where a 2 MW beam power shall impinge onto a target. [...]
CERN-ACC-2014-0200.
- 2014. - 3 p.

Detailed record - Similar records