| Home > EURISOL 100 kW Target Stations Operation and Implications for its Proton Driver Beam |
| Article | |
| Report number | EURISOL-03-21-2008-0017 ; CERN-AB-2006-055 |
| Title | EURISOL 100 kW Target Stations Operation and Implications for its Proton Driver Beam |
| Preprint title | EURISOL target stations operation and implications for its proton driver beam |
| Author(s) | Noah, Etam (CERN) ; Gerigk, Frank (CERM) ; Lettry, Jacques (CERN) ; Lindroos, Mats (CERN) ; Stora, Thierry (CERN) |
| Publication | 25/11/08 |
| Imprint | 13 Jul 2006 |
| Number of pages | 4 |
| In: | 10th European Particle Accelerator Conference, Edinburgh, UK, 26 - 30 Jun 2006, pp.1807-1809 |
| Subject category | 3: TASK 3 ; Accelerators and Storage Rings |
| Free keywords | EURISOL ; SNS ; ion ; proton ; target |
| Abstract | EURISOL, the next European radioactive ion beam (RIB) facility calls for the development of target and ion source assemblies to dissipate deposited heat and to extract and ionize isotopes of interest efficiently. The EURISOL 100 kW direct targets should be designed for a goal lifetime of up to three weeks. Target operation from the moment it is installed on a target station until its exhaustion involves several phases with specific proton beam intensity requirements. This paper discusses operation of the 100 kW targets within the ongoing EURISOL Design Study, with an emphasis on the requirements for the proton driver beam. |
| Copyright/License | publication: (License: CC-BY) |